by Tayrn Wooten | Jun 24, 2024
This historic early NC State building, built in 1945, is to be the new offices for the Dean of the College of Sciences at NC State. The systems being commissioned are a chilled water/hot water air handler being fed from campus chilled water and steam with multiple VAV...
by Tayrn Wooten | Jun 13, 2024
In 2019 we performed an exiting building Cx survey that identifeied substantial savings at N. Wilkesboro hospital. A majority of these items were low cost/no cost items that we worked with their facilities staff to implement sequence and parameter changes on the...
by Tayrn Wooten | Jun 13, 2024
Commissioning WorCx provided commissioning service for the addition of a 750-ton chiller to the existing chiller plant serving the USDA building, which we previously commissioned, and the new Joint School of Nanoscience and Engineering. We provided integral services...
by Tayrn Wooten | Jun 13, 2024
This project included the addition of multiple 750-ton chillers and several generators. After the chiller plant was completed, a boiler was also added to the plant. This boiler plant was built remotely for the original plant and was then tied in.
by Tayrn Wooten | Jun 13, 2024
Complex, Multi-phase project which included the introduction of several roof-top units to serve the nine story building. This project continued on to include integrating groups of floors into the units in the Novant FMC original building and operating hospital, “64...