Additional Services

Commissioning WorCx also provides an array of services to help our clients meet their overall operational goals and maximize their building’s efficiency.

Energy Star/ Energy to Care Benchmarking Assistance

Aid and assist clients in using benchmarking tools, connecting data across platforms, and empowering end users to make decisions based on their energy goals

Commissioning of Fire/Life Safety/ Security Systems

We provide NFPA 110 and 72 prerequisite inspections. We validate data from different vendors and test for the desired integration across multiple building systems.

Lab and Med Gas Pre-Certification

Installation inspections to ensure manufacturers’ instructions are followed and industry standards are met ahead of scheduling certifying entities to limit failed testing attempts.

Energy Management Assistance

Using a whole-building approach we review energy consumption on single or multi-building portfolios to help clients analyze their energy usage.

Mechanical Special Inspections

Third-party validation of specialized smoke control for atriums and stairwells.

Sustainability Consulting

We review overall greenhouse gas emissions and the facility’s carbon footprint and make recommendations. We also can assist facilities with securing utility incentives.

what our clients say

Club Fitness
“Our conclusion was that we needed a consultant that truly represented our interests and not...
Read More
Donald E. Linder, M.D.
Owner ( ClubFitness LLC )
“Our conclusion was that we needed a consultant that truly represented our interests and not those of the HVAC contractor. That is when we brought in Commissioning WorCx. This team of professionals was able to identify our problems, recommend cost effective repairs, and oversee the work to assure it was done correctly. Their involvement saved our organization tens of thousands of dollars in repair costs and ongoing energy expense.”
Club Fitness
Donald E. Linder, M.D.
Owner ( ClubFitness LLC )
GTCC Center for Advanced Manufacturing
“As one might expect with a project of this magnitude, there were issues with...
Read More
Mitchell Johnson
VP Operations and Facilities (GTCC)
“As one might expect with a project of this magnitude, there were issues with the contractors and the subs, which created further complications for the commissioning of the project. However, Commissioning WorCx remained steadfast and worked through the issues. The resulting project has met and exceeded the college's expectations within the limitations of the environment the systems must perform in. This is in no small part due to the diligence and perseverance of the commissioning agent.”
GTCC Center for Advanced Manufacturing
Mitchell Johnson
VP Operations and Facilities (GTCC)
Delalio Elementary School
“Without Commissioning WorCx Group III may not have gotten through the LEED requirements on this...
Read More
Jackie W. Johnson
VP Estimating (Group III Management)
“Without Commissioning WorCx Group III may not have gotten through the LEED requirements on this school. In addition your commissioning efforts turned up numerous mechanical issues which we were able to get corrected in a timely fashion and turn the job over on time.”
Delalio Elementary School
Jackie W. Johnson
VP Estimating (Group III Management)
Joint School of NanoScience and NanoEngineering at Gateway Research Park
“And when we were having difficulty properly controlling the chiller plant hat supports these facilities...
Read More
John Merrill
Executive Director (Gateway University Research Park)
“And when we were having difficulty properly controlling the chiller plant hat supports these facilities your evaluation assisted in correcting several problems and the plant is now running smoothly. We greatly appreciate the many services that you’ve provided over the past few years.”
Joint School of NanoScience and NanoEngineering at Gateway Research Park
John Merrill
Executive Director (Gateway University Research Park)
High Point University Health Science Building
“Commissioning WorCx worked closely with the subcontractors and designers with great technical knowledge and problem-solving...
Read More
Justin Swanson
Project Executive (Frank L Blum Construction Company)
“Commissioning WorCx worked closely with the subcontractors and designers with great technical knowledge and problem-solving abilities that were invaluable to ensure the system as operating at the level needed for this scientific building. I would highly recommend Commission WorCx to complete the commissioning on any building and look forward to working with them in the future.”
High Point University Health Science Building
Justin Swanson
Project Executive (Frank L Blum Construction Company)
High Point University
“They remain very engaged in problem solving during the warranty period and we actually hired...
Read More
Jason Sweet
Director of Design and Construction (HPU)
“They remain very engaged in problem solving during the warranty period and we actually hired them to help with MEP coordination to bring the job over the finish line. We look forward to working with them on future projects and whole-heartedly recommend them for anyone who wants the real thing when it comes to commissioning.”
High Point University
Jason Sweet
Director of Design and Construction (HPU)
High Point University
“During the Construction process, Commissioning WorCx was very prompt in issuing in their reports...
Read More
Marty Snyder, AIA
Project Architect (Mercer Architecture)
“During the Construction process, Commissioning WorCx was very prompt in issuing in their reports and updates on the projects. They also lead numerous meetings (both on-site and conference calls) with the Design Team, Owners, the General Contractor and their Subcontractors to review the outstanding MEP issues and document procedures to remedy them.”
High Point University
Marty Snyder, AIA
Project Architect (Mercer Architecture)