|
Select project experience includes:
|
Tom Foster, PE
O
|
UNIVERSITY
FACILITIES (SCO)
UNC-PEMBROKE DIAL BLDG, PEMBROKE, NC
-
Renovation of 35,000 square-foot classroom bldg that was closed for mold remediation including retrocommissioning and oversight of installation of new control system to control and monitor humidity. Contact Dave Girardot, Assoc. Vice Chancellor-Facilities, 910.962.7612
girardotd@uncw.edu.
UNC-PEMBROKE EDUCATION BLDG, PEMBROKE, NC
-
Commissioning of MEP on 30,000 square-foot classroom building gut rehab of all HVAC, controls, and lighting. Including Design Phase Commissioning. Contact Dave Girardot, Assoc. Vice Chancellor-Facilities, 910.962.7612
girardotd@uncw.edu.
LEED ™ FACILITIES
PROXIMITY HOTEL, GREENSBORO, NC
-
110,000 square-foot class A 7 storey hotel with associated restaurant facility.
Providing prerequisite and enhanced Commissioning services and assistance on co-ordination of
entire LEED process direct to owner. Includes design review and warranty period with "Lessons Learned" workshop.
Contact Will Stevens, VP 336.370.0966,
wstevens@qwrh.com
WEAVER-COOKE OFFICE BUILDING, GREENSBORO, NC
-
16,000 square foot office building for progressive general contractor's own
offices to be LEED™ certified. Includes full commissioning services.
Contact Joe Hooten, Sr. VP, 336.378.7900,
jhooten@weavercooke.com
MECKLENBURG COUNTY MEDICAL EXAMINERS OFFICE, CHARLOTTE, NC
-
" 17,500 square foot state of the art medical examiners lab, morgue and associated offices.
Hired in early schematic phase to help co-ordinate design and provide both prerequisite and enhanced Cx services.
Contact Russ Angelo, AIA, 704.333.0483,
russ@angeloarchitects.com
SYNGENTA BIOTECHNOGY, RTP, NC
LEED commissioning of MEP, specialty plumbing, and fire and life safety systems on 12K sq ft of laboratory renovations. Includes retrocommissioning evaluation of 3 building complex totaling 150,000 sq ft.
LAB
FACILITIES
PHARMACORP, HIGH POINT, NC
-
16,000 square-foot pharmaceutical research and development facility with large laboratory and cleanroom area, multiple pressurization areas and conventional offices; also fixed existing pressurization problems on TransTech Pharma (adjacent parent company)
HIGH RISE FACILITIES
21 BATTERY PARK, ASHEVILLE, NC
-
Performed special inspections on atrium smoke evacuation and pressurization, stairwell pressurization, emergency generator operation, and fire alarm operation in all modes on 7 storey residential high-rise w/retail and parking on bottom floors.
HOSPITAL
FACILITIES
High Point Regional Health System, High Point, NC
-
Commissioned MEP, Fire and Life Safety, and Elevators on 60,000 square-foot new Medical Office Building construction phase.
-
Commissioned MEP on 18,000 square-foot Finance Building renovation including design changes at CD phase and revising control sequence.
-
Commissioned MEP on 5th floor renovation of occupied Behavioral Health Unit and upfit of new space for administrative offices. Included co-ordination and oversight of complete building TAB working with the Phoenix Agency.
-
Retro-commissioned 60,000 square-foot Millis Building to address high humidity and control issues.
-
Contact- David Murray, Dir. Construction Management, 336.878.6034,
dmurray@hprhs.com
DUKE UMC SURGERY ADDITION, DURHAM, NC
-
Working with Michael Mantai to provide MEP commissioning on 10 storey addition and renovation and reworking of existing and new OR suite, totaling 125,000 sq feet.
Wilkes Regional Medical Center, North Wilkesboro, NC
-
Design and commission rework of OR Suite controls w/DDC overlaid on pneumatic, addition of in-line chilled water coils, and application of Energy Recovery Ventilator to better control humidity and temperature in Operating Rooms. Contact-Paul Barlow, Dir. of Facilities, 336.651.8181,
pbarlow@wilkesregional.com
|
|